EPC Products Teaching and Research Laboratory Equipment Advanced Fluid Mechanics C30 Subsonic Wind Tunnel
产品中心
BBS| Hot Topic
C30 Subsonic Wind Tunnel

Model:C30

Use:Subsonic Wind Tunnel

Standard:

Related Products

    Technical specifications

    -Astand-alonesubsonicwindtunnelforconductingexperimentsinaerodynamics

    -The wind tunnel is mounted on a steel base on wheels for mobility

    -Working section of 310mm by 310mm and 600mm long

    -The unit operates as an open circuit system

    -Inverter controlled AC suction fan to drag the air flow through the working section

    -Accurate speed control up to 40 m/s

    -The duct incorporates a honeycomb flow straightener to even the direction of flow

    -The working section incorporates three tappings on its top section to incorporate pitot tubes. These are located at the start of the working section, upstream and downstream of the model under test location

    -All the optional and self-built models are inserted through a circular hatchof160mmdiameter.Eachoftheaccessoriessuppliedarebuilt intoindividualhatcheswhichincorporateanangularscale,enabling themodelstobemanuallyrotatedtoknownangles

    Linear speed

    0-40m/s

    Working section

    Length: 600mm

    Width: 310mm

    Height: 310mm

    Axial fan power

    Approx. 4kW

    Fan turning speed

    3000rpm

    Measuring ranges

    Manometer: 0-250mm H20

    Wind speed: 0-40m/s

    Angle of inclination: +/- 180°

    Lift force: +/- 10N

    Drag force: +/- 10N

    Pitching moment: +/- 3N

    Overall dimensions

    Dimensions

    Length

    3.785m

    Width

    0.990m

    Height

    1.930m

    Packed and crated shipping specifications (for 2 cases)

    Volume

    7.95m3

    Gross weight

    665kg



    Features

    -Robust design, manufactured in high quality materials for long life of the product

    -Connectionstomainbaseunitviaflexiblehosesandquickreleasefittings

    -Theunitissuppliedonwheelsforeaseofmovement;thesecanbe removedandtheunitboltedtothefloorforpermanentinstallation

    -Unit supplied with a complete manual including the following sections:Safety,Installation,EquipmentDiagramsandSpecifications, RoutineMaintenance,OperationandGuidedExperiments


    Project Case
    Solution
      Download
        相关标签
        Armfield,C30,Subsonic Wind Tunnel
        Baidu
        map